Crude Oil
Crude Oil

Crude Oil

 

Iraq – Turkey Crude Oil Pipeline

Commenced in 1976, the first tanker loading was performed from the pipeline in 1977. The transportation capacity of the pipeline was increased more than double by various projects and as of 1987 it reached to 70,9 million tonnes per year.

Ceyhan – Kırıkkale Crude Oil Pipeline

This line started to operate in 1986 and its capacity is 7,2 million tonees per year.

Batman – Dörtyol Crude Oil Pipeline

This line started to operate in 1967 as the Turkey’s first COP and was transferred to BOTAŞ in 1984. Its capacity is 4.5 million tonnes per year.

Bakü – Tblisi – Ceyhan Crude Oil Pipeline

Bakü – Tblisi – Ceyhan (BTC) Crude Oil Pipeline was constructed in order to transport oil from Caspian region, especially the Azerbaijan oil, to Ceyhan via Azerbaijan and Georgia securely and allowably in terms of the economy and environment and then to world markets by means of tankers.

As a 50 millions tonnes per year transportation capacity, the first tanker loading took place in 2006. The line is operated by our subsidiary, BOTAŞ International Limited Company (BIL).

 

Amounts of Transported Crude Oil Anually (Thousand Barrels)


IRAQ-TURKEY
COP

CEYHAN-KIRIKKALE
COP

BATMAN-DÖRTYOL
COP (**)

BTC (BIL)
COP

2019*

27.845

6.501

2.820

39714

2018

134.662

31.300

20.470

255.770

2017

184.927

39.292

19.757

252.763

2016

189.439

35.357

20.092

253.976

2015

192.426

30.982

19.724

262.188

2014

55.984

22.213

17.780

260.675

2013

91.883

23.740

18.195

249.617

2012

134.506

21.962

17.649

250.345

2011

163.276

21.786

17.092

257.143

2010

144.590

19.061

17.378

286.214

2009

167.467

20.090

16.992

285.492

2008

132.941

21.433

16.794

264.092

 

*As of February

** Including amount delivered to the refinery

Amounts of Transported Crude Oil Monthly (Thousand Barrels)

YEAR

MONTH

IRAK-TÜRKİYE
COP

CEYHAN-KIRIKKALE
COP

BATMAN-DÖRTYOL
COP (*)

BTC (BIL)
COP

2019

February

12.507

2.907

1.187

18.407

2019

January

15.338

3.594

1.633

21.307

2018

December

14.699

2.893

1.438

21.388

2018

November

13.575

3.366

1.669

20.836

2018

October

13.250

2.314

1.668

23.360

2018

September

12.139

3.933

1.768

21.621

2018

August

10.784

3.041

1.775

21.136

2018

July

8.838

3.315

1.904

22.712

2018

June

9.952

3.080

1.713

21.211

2018

May

10.426

3.031

1.897

21.734

2018

April

9.365

1.668

1.836

19.522

2018

March

10.194

1.119

1.454

21.077

** Including amount delivered to the refinery.

Mevcut Ham Petrol Boru Hatları

 

Length (km)

Capacity

 Diameter (inch)

Pump Station

Storage Tanker

 

milyon ton/yıl

milyon varil/yıl

 

Iraq-Turkey COP

 

Turkey

Total

70,9

553

 

6

 

12

 

Line I

651

986

40

Line II

652

890

46

Total

1.303